Fire Risk Assessment

Scheduled for Sep 23, 08:30 - 16:30 BST

Scheduled

Fire Risk Assessment – Whole Building

πŸ“… Date: Tuesday 23rd September 2025
πŸ•’ Timeframe: All day
πŸ“ Area: Entire Engine House building

What’s happening:
As part of our annual compliance requirements, a full Fire Risk Assessment will be carried out across the building. Our assessor, accompanied by a member of The Engine House team, will need access to all offices and communal areas throughout the day.

What you need to do:
βœ… Ensure good housekeeping is maintained in your office space
βœ… Follow safe electrical practices as outlined in the Engine House Emergency Action Plan (see QR codes on the back of every office door)
βœ… Be prepared to allow access when the assessor and team arrive at your space

Impact:

Access will be required to all private and communal areas

No alternative arrangements or safety precautions are needed beyond the above

Thank you for your cooperation in helping us maintain a safe working environment for all members.

#ConnectCreateCollaborate
Posted Sep 17, 2025 - 13:23 BST
This scheduled maintenance affects: Ground Floor Studios & Fixed Desk Co-Working, First Floor Studios, and Second Floor Studios.